{"product_id":"washable-nylon-round-rope-training-dog-leash-long-lead-outdoor","title":"Washable Nylon Round Rope Training Dog Leash Long Lead Outdoor","description":"\u003cp\u003e\u003cb\u003eDescription:\u003c\/b\u003e\u003c\/p\u003e\u003cp\u003eThis washable nylon round rope dog leash is designed for outdoor training sessions where durability and hygiene matter most. The round webbing construction offers a comfortable grip that resists twisting and tangling during active training exercises. A practical long lead for pet owners who want a clean and reliable outdoor training tool.\u003c\/p\u003e\u003cp\u003e\u003cb\u003eFeatures:\u003c\/b\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003eFully washable nylon construction keeps the leash clean and hygienic after muddy walks.\u003c\/li\u003e\n\u003cli\u003eRound rope webbing design provides a comfortable grip that does not twist or tangle.\u003c\/li\u003e\n\u003cli\u003eLong lead length gives dogs freedom to roam during outdoor recall and training sessions.\u003c\/li\u003e\n\u003cli\u003eDurable nylon material resists wear and maintains strength during intense training use.\u003c\/li\u003e\n\u003cli\u003eSuitable for outdoor training environments including parks, fields, and open ground areas.\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"CRAZE","offers":[{"title":"Black-1.2 X 150cm","offer_id":48544605110517,"sku":"CZ_F_CNPS22111724805_1","price":2099.0,"currency_code":"INR","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0715\/9595\/0325\/files\/Washable-Nylon-Round-Rope-Training-Dog-Leash-Webbing-Long-Lead-Pet-Leash-Suitable-For-Outdoor-Training_22c759ac-e81b-4e0a-890d-6b6b654daa62.webp?v=1788610588","url":"https:\/\/thecraze.in\/products\/washable-nylon-round-rope-training-dog-leash-long-lead-outdoor","provider":"CRAZE","version":"1.0","type":"link"}