{"product_id":"nylon-dog-leash-long-lead-15m-10m-for-small-large-dogs","title":"Nylon Dog Leash Long Lead 1.5m \u0026 10m for Small \u0026 Large Dogs","description":"\u003cp\u003e\u003cb\u003eDescription:\u003c\/b\u003e\u003c\/p\u003e\u003cp\u003eThis nylon dog leash is available in two lengths — a handy 1.5m for close control and a long 10m for recall training — making it a versatile option for different walking situations. Suitable for Chihuahuas and small breeds as well as large dogs, the PP rope material is durable and easy to handle outdoors. A flexible everyday leash for dog owners who need options for different training scenarios.\u003c\/p\u003e\u003cp\u003e\u003cb\u003eFeatures:\u003c\/b\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003eAvailable in 1.5M and 10M lengths for close control and long-distance recall training.\u003c\/li\u003e\n\u003cli\u003eSuitable for Chihuahuas, small breeds, and large dogs for versatile everyday use.\u003c\/li\u003e\n\u003cli\u003eDurable PP nylon rope construction handles daily outdoor walks and training sessions.\u003c\/li\u003e\n\u003cli\u003eLightweight and easy to carry, suitable for parks, open fields, and urban walking.\u003c\/li\u003e\n\u003cli\u003eA flexible and versatile gift for dog owners who need options for different walk distances.\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"CRAZE","offers":[{"title":"Black-1.5m","offer_id":48544516538613,"sku":"CZ_F_CNPS22111723605_1","price":999.0,"currency_code":"INR","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0715\/9595\/0325\/files\/1-5m-10m-Dog-Long-Nylon-Leashes-Rope-Outdoor-Training-Running-Pet-Leash-Belt-PP-Cat.webp?v=1788610571","url":"https:\/\/thecraze.in\/products\/nylon-dog-leash-long-lead-15m-10m-for-small-large-dogs","provider":"CRAZE","version":"1.0","type":"link"}