img_5035923
img_5035924
img_5035925
img_5035926
img_5035927
img_5035928
img_5035929

Nylon Dog Leash Long Lead 1.5m & 10m for Small & Large Dogs

Rs. 999.00
Rs. 1,499.00
Rs. 999.00
(-33%)
10 customers are viewing this product
Length: Black-1.5m
Subtotal: Rs. 999.00
Overseas

Ships from our international warehouse ! This item ships from our international warehouse to bring you a wider range of products. Delivery may take a little longer, but all duties and taxes are included — there are no additional charges on delivery.


Estimated to be delivered between 15/09/2026 - 26/09/2026

📦 Tracked shipping
🔒 Secure checkout
Buyer protection
No import duties or extra fees

Free Shipping

Free standard shipping on prepaid orders

img_5035923

Nylon Dog Leash Long Lead 1.5m & 10m for Small & Large Dogs

Rs. 1,499.00 Rs. 999.00

Nylon Dog Leash Long Lead 1.5m & 10m for Small & Large Dogs

Rs. 1,499.00 Rs. 999.00
Length: Black-1.5m

Description:

This nylon dog leash is available in two lengths — a handy 1.5m for close control and a long 10m for recall training — making it a versatile option for different walking situations. Suitable for Chihuahuas and small breeds as well as large dogs, the PP rope material is durable and easy to handle outdoors. A flexible everyday leash for dog owners who need options for different training scenarios.

Features:

  • Available in 1.5M and 10M lengths for close control and long-distance recall training.
  • Suitable for Chihuahuas, small breeds, and large dogs for versatile everyday use.
  • Durable PP nylon rope construction handles daily outdoor walks and training sessions.
  • Lightweight and easy to carry, suitable for parks, open fields, and urban walking.
  • A flexible and versatile gift for dog owners who need options for different walk distances.

Shipping

We provide shipping to all parts of India, with warehouses located within the country and abroad. Delivery times typically range from 2 to 14 days, depending on the destination and the dispatch location.

When you place an order, we will provide an estimated shipping and delivery timeline based on item availability and your chosen shipping method. Most items qualify for free shipping when prepaid payment is selected.

Occasionally, a product may be out of stock due to high demand. However, we replenish our inventory quickly, and your order will be shipped as soon as possible. In such cases, our customer service team will contact you with a delivery estimate. Whenever possible, we also offer a free upgrade to express shipping.

Returns Policy

You may return most new, unopened items within 7 days of delivery for a full refund. We'll also pay the return shipping costs if the return is a result of our error (you received an incorrect or defective item, etc.).

You should expect to receive your refund within 3-5 days of receiving your return package, however, in many cases you will receive a refund more quickly.

If you need to return an item, please contact us and our support team will assist you.