{"product_id":"8m-40kg-retractable-nylon-dog-leash-long-lead-large-breeds","title":"8M 40kg Retractable Nylon Dog Leash Long Lead Large Breeds","description":"\u003cp\u003e\u003cb\u003eDescription:\u003c\/b\u003e\u003c\/p\u003e\u003cp\u003eThis heavy-duty 8M retractable leash supports up to 40kg, designed for big and medium dog breeds. Strong durable nylon rope with reflective strip for safe night walks. Smooth one-button retract for outdoor daily use.\u003c\/p\u003e\u003cp\u003e\u003cb\u003eFeatures:\u003c\/b\u003e\u003c\/p\u003e\u003cul\u003e\n\u003cli\u003e8 metres of freedom for medium and large dogs up to 40kg\u003c\/li\u003e\n\u003cli\u003eStrong durable nylon rope built for big and active breeds\u003c\/li\u003e\n\u003cli\u003eReflective strip for safe high visibility on evening walks\u003c\/li\u003e\n\u003cli\u003eSmooth one-button auto-retract and lock mechanism\u003c\/li\u003e\n\u003cli\u003eErgonomic handle for comfortable grip on long outdoor walks\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"CRAZE","offers":[{"title":"Black With Box White-5M","offer_id":48544801030389,"sku":"CZ_F_CNPS22111725574_1","price":3099.0,"currency_code":"INR","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0715\/9595\/0325\/files\/8m-40kg-Automatic-Retractable-Dog-Leash-Long-Strong-Durable-Reflective-Nylon-Rope-For-Medium-Big-Dogs.webp?v=1788608771","url":"https:\/\/thecraze.in\/products\/8m-40kg-retractable-nylon-dog-leash-long-lead-large-breeds","provider":"CRAZE","version":"1.0","type":"link"}